NEWS RECOMMENDATION巖棉復合板保溫系統(tǒng)性能指標有哪些?
發(fā)布時間:2021-01-31 來源:http://plisse.cn/
巖棉復合板在外墻保溫系統(tǒng)的指標是耐候性能、防水性能、抗風荷載性能、耐凍的性能等五個方面和指標,下面我們在這5個標準的角度來分析一下巖棉保溫系統(tǒng)的性能指標。
The indicators of rock wool composite board in the external wall insulation system are weather resistance, waterproof performance, wind load resistance, frost resistance and other five aspects and indicators. We will analyze the performance indicators of rock wool insulation system from the perspective of these five standards.
1、外墻巖棉復合板系統(tǒng)的耐候性。經(jīng)過了耐候性的試驗之后,保溫層不能出現(xiàn)起泡或脫落的現(xiàn)象;抹面層和保溫層拉伸的粘接強度要小于0.01MPa和0.1MPa,要保證破壞買呢在保溫層中。
The weatherability of the exterior wall rock wool composite board system. After the weather resistance test, the insulation layer shall not blister or fall off; the tensile bonding strength of the plastering layer and the insulation layer shall be less than 0.01Mpa and 0.1MPa, and the damage shall be ensured in the insulation layer.
2、巖棉復合板保溫系統(tǒng)給的防水性。保溫層的吸水量( 浸水1 h ) , 要控制在1000g / m 2 .
2. Rock wool composite board insulation system to improve the water resistance. The water absorption of insulation layer (soaking for 1 h) should be controlled at 1000g / m2
3、巖棉復合板保溫系統(tǒng)的抗風荷載性。不小于工程 項目的風荷載設計值, 抗風壓安全系數(shù) K 應不小于1.5.
3. The wind load resistance of rock wool composite board insulation system is analyzed. Not less than the wind load design value of the project, and the wind pressure safety factor K shall not be less than 1.5
4、巖棉板保溫系統(tǒng)的耐凍性。 30 次凍融循環(huán)后護面層無空鼓、 脫落。
4. The frost resistance of rock wool board insulation system. After 30 freeze-thaw cycles, there was no hollowing or falling off of the protective layer.
5、巖棉板保溫材料系統(tǒng)的抗外力破壞性。
5. The results show that the rock wool board insulation material system has good resistance to external force damage.
以上是巖棉復合板保溫系統(tǒng)檢驗的5個標準型指標,達不到指標的保溫系統(tǒng),就是不合格的施工。
The above are the five standard indexes of rock wool composite board insulation system inspection. If the insulation system fails to meet the indexes, it is unqualified construction.
在施工的時候要選擇有經(jīng)驗的施工團隊,同時也要控制施工材料的性能和質(zhì)量,才可以保證保溫系統(tǒng)的合格。
In the construction, we should choose an experienced construction team and control the performance and quality of construction materials to ensure the qualification of the insulation system.