施工順序
Construction sequence
平面施工順序:每層鋼筋桁架樓承板的鋪設(shè)宜根據(jù)施工圖起始位置向一個方向鋪設(shè),后處理邊角部分。
Plane construction sequence: The laying of each layer of steel truss floor support plate should be carried out in one direction according to the starting position of the construction drawing, and finally, the edges and corners should be treated.
立面施工順序:隨主體結(jié)構(gòu)安裝施工順序鋪設(shè)相應(yīng)各層的鋼筋桁架樓承板。
Facade construction sequence: Lay corresponding steel truss floor support plates for each floor in accordance with the installation and construction sequence of the main structure.
鋼筋桁架樓承板安裝
Installation of steel bar truss floor support plate
適宜在下一節(jié)鋼柱及配套鋼梁安裝完畢后進(jìn)行。
It is suitable to proceed after the installation of the next section of steel columns and supporting steel beams.
樓板鋪設(shè)前
Before laying the floor slab
應(yīng)按圖紙所示的起始位置放設(shè)鋪板時的基準(zhǔn)線。對準(zhǔn)基準(zhǔn)線,安裝塊板, 并依次安裝其它板。樓板連接采用扣合方式,板與板之間的拉鉤連接應(yīng)緊密,保證澆筑混凝土?xí)r不漏漿。
The reference line for laying the board should be placed at the starting position shown on the drawing. Align the reference line, install the first board, and then install the other boards in sequence. The connection of the floor slab adopts a buckle method, and the hook connection between the slabs should be tight to ensure that there is no leakage during the pouring of concrete.
鋼筋桁架樓承板就位之后
After the steel truss floor support plate is in place
應(yīng)將其端部的豎向鋼筋及底模與鋼梁點(diǎn)焊牢固。沿板寬度方向?qū)⒌啄Ec鋼梁點(diǎn)焊,焊接采用手工電弧焊,間距不大于300mm。
The vertical reinforcement and bottom formwork at its end should be firmly spot welded with the steel beam. Spot weld the bottom formwork with the steel beam along the width direction of the plate. Manual arc welding is adopted for welding, and the spacing is not more than 300mm.
樓板鋪設(shè)前
Before laying the floor slab
應(yīng)按圖紙所示的起始位置放設(shè)鋪板時的基準(zhǔn)線。對準(zhǔn)基準(zhǔn)線,安裝塊板, 并依次安裝其它板。樓板連接采用扣合方式,板與板之間的拉鉤連接應(yīng)緊密,保證澆筑混凝土?xí)r不漏漿。
The reference line for laying the board should be placed at the starting position shown on the drawing. Align the reference line, install the first board, and then install the other boards in sequence. The connection of the floor slab adopts a buckle method, and the hook connection between the slabs should be tight to ensure that there is no leakage during the pouring of concrete.
This article is supported by Jinan Building Support Board. For more detailed and exciting content, please click on our website http://plisse.cn We will wholeheartedly provide you with satisfactory service.