亚洲一区播放,波多野结衣被躁,中日韩高清在线观看的,三上悠亚免费视频

從事濟(jì)南彩鋼板房,彩鋼瓦,復(fù)合板,巖棉板,C型鋼,濟(jì)南鋼結(jié)構(gòu)的廠家
服務(wù)電話:0531-83658718
熱門搜索:濟(jì)南方管,濟(jì)南彩鋼瓦,濟(jì)南巖棉板,濟(jì)南型鋼,濟(jì)南樓承板,濟(jì)南泡沫復(fù)合板
公司動(dòng)態(tài) 所在位置- 首頁-新聞中心-公司動(dòng)態(tài)巖棉板使用時(shí)的校對(duì)方法了解

巖棉板使用時(shí)的校對(duì)方法了解

發(fā)布時(shí)間:2022-05-12 來源:http://plisse.cn/

實(shí)際上巖棉板的校對(duì)方法需要幾個(gè)步驟,其中一些步驟在后面的操作過程中比較復(fù),下面就來了解了解吧。
In fact, the proofreading method of rock wool board requires several steps, some of which are more complex in the later operation process. Let's understand it below.
控制首層柱頂板和其他截面柱兩端的標(biāo)高有兩種方式:根據(jù)相對(duì)標(biāo)高或設(shè)計(jì)標(biāo)高裝置,常用的是相對(duì)標(biāo)高裝置。板柱吊裝到位后,用大六角高強(qiáng)螺栓連接固定,
There are two ways to control the elevation of the top plate of the first floor column and the two ends of other section columns: according to the relative elevation or design elevation device, the common is the relative elevation device. After the plate column is hoisted in place, it is connected and fixed with large hexagon high-strength bolts,
測(cè)量上下柱頂面標(biāo)高,用吊車吊起,用防滑桿調(diào)整接頭間隙,驅(qū)動(dòng)板楔,采用點(diǎn)焊抑制板柱下落,立柱安裝好后,在立柱頂部放置水平儀,測(cè)量每個(gè)立柱頂?shù)南鄬?duì)標(biāo)高,并將結(jié)果與下一個(gè)立柱頂?shù)念A(yù)檢長(zhǎng)度進(jìn)行比較,進(jìn)行感應(yīng)處理。
Measure the top elevation of the upper and lower columns, lift them with a crane, adjust the joint gap with an anti-skid rod, drive the plate wedge, and use spot welding to suppress the falling of the plate column. After the column is installed, place a level on the top of the column, measure the relative elevation of each column top, and compare the results with the pre inspection length of the next column top for induction treatment.
濟(jì)南巖棉板認(rèn)為當(dāng)比對(duì)結(jié)果超過5mm時(shí),應(yīng)調(diào)整板柱樓承板。具體方法是在低碳板板上填充一定的厚度,但要注意每塊板的厚度不能過大,以防增加其他節(jié)點(diǎn)的困難。
Jinan rock wool board believes that when the comparison result exceeds 5mm, the plate column floor bearing plate should be adjusted. The specific method is to fill a certain thickness on the low-carbon plate, but it should be noted that the thickness of each plate should not be too large to prevent the difficulty of adding other nodes.
上欄的垂直和水平十字準(zhǔn)線。盡量使上下柱的交叉線重疊,以防止接頭錯(cuò)開。如有誤差,在連接耳板中填入厚度為0.5~1.0mm的墊板,并擰緊螺栓。
Vertical and horizontal crosshairs in the upper column. Try to overlap the cross lines of upper and lower columns to prevent staggered joints. If there is any error, fill the connecting padeye with a backing plate with a thickness of 0.5 ~ 1.0mm, and tighten the bolts.
濟(jì)南巖棉板
對(duì)于板柱相關(guān)尺寸的預(yù)檢,方法是下一個(gè)板柱的柱頂直線度誤差是底軸線、位移、焊接變形、日照溫度、直線度和以前板柱的其他錯(cuò)誤。將直線度留在誤差的相反方向。
For the pre inspection of relevant dimensions of slab column, the method is that the straightness error of the top of the next slab column is the bottom axis, displacement, welding deformation, sunshine temperature, straightness and other errors of the previous slab column. Leave the straightness in the opposite direction of the error.
在板柱、底板板楔或千斤頂?shù)钠狈较?,在不超過單節(jié)柱直線度的前提下,小范圍控制柱頂軸線偏移,并擰緊臨時(shí)連接凸耳的大六角高強(qiáng)度螺栓。附加扭矩值。凸耳板上螺栓孔的直徑應(yīng)比螺栓的直徑大4.0mm。在連接標(biāo)準(zhǔn)柱的相關(guān)梁裝置上形成標(biāo)準(zhǔn)框架體。
In the deflection direction of plate column, bottom plate wedge or Jack, on the premise of not exceeding the straightness of single section column, the offset of column top axis shall be controlled in a small range, and the large hexagon high-strength bolts with temporary connecting lugs shall be tightened. Additional torque value. The diameter of the bolt hole on the lug plate shall be 4.0mm larger than the diameter of the bolt. The standard frame body is formed on the relevant beam device connecting the standard column.
巖棉板是當(dāng)前建筑行業(yè)的產(chǎn)品之一,如今也對(duì)巖棉板的要求也越來越高,所以要想使用的更好就要來了解相應(yīng)問題。更多內(nèi)容就來網(wǎng)站plisse.cn吧。
Rock wool board is one of the products in the current construction industry, and now the requirements for rock wool board are becoming higher and higher. Therefore, if you want to use it better, you need to understand the corresponding problems. For more information, please visit plisse.cn Com.