Rock wool board is mostly used in construction, which belongs to a kind of external wall insulation. Therefore, many rock wool board manufacturers have expanded their processing workshops and fought a price war to give rock wool board a certain price advantage and attract more customers. What are the eight key points before and after rock wool board construction?
1.巖棉板外墻外保溫施工期間,基層及施工環(huán)境溫度低于5℃時不得施工。在五級以上大風(fēng)天氣和雨、雪天氣不得施工。施工時及施工后,應(yīng)采取有效措施防止雨水沖刷及烈日暴曬,并應(yīng)及時做保護層。如施工中突遇降雨,應(yīng)采取措施防止雨水沖刷墻面;冬季施工應(yīng)按照相關(guān)標(biāo)準(zhǔn)采取防凍措施。
1. During the construction of external insulation of rock wool board exterior wall, the construction shall not be carried out when the temperature of base course and construction environment is lower than 5 ℃. Construction shall not be carried out in windy weather above level 5 and rainy and snowy weather. During and after the construction, effective measures shall be taken to prevent rainwater scouring and scorching sun exposure, and a protective layer shall be made in time. In case of sudden rainfall during construction, measures shall be taken to prevent rainwater from scouring the wall; Antifreeze measures shall be taken for winter construction in accordance with relevant standards.
2.大面積施工前,按規(guī)定應(yīng)在現(xiàn)場采用相同材料,構(gòu)造做法和工藝制作樣板墻,并經(jīng)有關(guān)各方確認后方可進行工程施工。
2. Before large-scale construction, the same materials, construction methods and processes shall be used to make the sample wall on the site according to the regulations, and the project construction can be carried out only after being confirmed by the relevant parties.
3.用巖棉板施工時,操作工人應(yīng)佩戴好勞防用品,做好職業(yè)健康保護,并注重施工安全。
3. When using rock wool board for construction, operators should wear labor protection articles, do a good job in occupational health protection, and pay attention to construction safety.
4.巖棉板外保溫系統(tǒng)有關(guān)必檢的材料應(yīng)送有資質(zhì)的檢測機構(gòu)進行檢測,檢測合格方可使用。
4. Materials related to the external insulation system of rock wool board that must be inspected should be sent to a qualified testing organization for testing, and can be used only after passing the testing.
5.巖棉板的粘貼宜采用條粘法或點粘法,涂膠面積不應(yīng)小于50%。巖棉板抹完膠粘劑后,應(yīng)先將保溫板下端與基層粘貼,巖棉板應(yīng)自下而上沿水平方向橫向鋪設(shè),并應(yīng)采取邊鋪邊錨固,板縫應(yīng)自然靠緊,板間縫隙不得大于2mm,如縫寬2mm時,應(yīng)有保溫材料填充處理,相鄰板面應(yīng)平齊,板間高差不得大于1.5mm。
5. The sticking of rock wool board should adopt strip sticking method or point sticking method, and the gluing area should not be less than 50%. After the adhesive is applied to the rock wool board, the lower end of the thermal insulation board should be pasted with the base course first. The rock wool board should be laid horizontally from bottom to top, and should be anchored while laying. The board joints should be naturally close, and the gap between the boards should not be greater than 2mm. If the joint width is 2mm, there should be thermal insulation material filling treatment, the adjacent board surfaces should be flush, and the height difference between the boards should not be greater than 1.5mm.
6.所有可達巖棉板的穿墻管線與構(gòu)件,其出口部位應(yīng)用相同材料填實后進行防水密封處理。
6. The outlet of all through wall pipelines and components that can reach the rock wool board shall be filled with the same material and then treated with waterproof sealing.
7.如在施工過程中發(fā)現(xiàn)貼面層脫落,應(yīng)及時采取粘結(jié)或者用錨固件錨固的方式固定,并及時進行外飾面層施工。
7. If the veneer layer is found to fall off during the construction process, it should be fixed in a timely manner by bonding or anchoring with anchors, and the exterior decoration surface layer construction should be carried out in a timely manner.
8.
濟南巖棉板抹面層施工應(yīng)符合以下要求:
8. The construction of Jinan rock wool board plastering layer shall meet the following requirements:
巖棉板粘貼完畢,應(yīng)對板的抹灰面進行表面處理,用不銹鋼抹刀對整個表面涂刮抹面膠漿(厚度1~1.5mm),并壓入巖棉板的表層纖維中。抹面膠漿應(yīng)嚴(yán)格按照產(chǎn)品使用說明書進行配置,配置好的膠粘劑應(yīng)避免太陽直射,并應(yīng)在2h內(nèi)用完。
After the rock wool board is pasted, the plastered surface of the Board shall be treated, and the whole surface shall be coated with plastering paste (thickness 1 ~ 1.5mm) with a stainless steel spatula, and pressed into the surface fiber of the rock wool board. The plastering glue should be configured in strict accordance with the product instructions. The configured adhesive should avoid direct sunlight and should be used up within 2H.
抹面層分二層進行。較好層抹面膠漿厚度2~3mm,應(yīng)先用不銹鋼鋸齒抹刀抹灰,后用大抹刀抹平,并趁濕壓入玻纖網(wǎng)布,待膠漿稍干硬至可觸碰時安裝錨固件,用抹面膠漿封堵錨固件塑料圓盤及其周邊;較好層抹面膠漿稍干可進行第二層抹面膠漿施工,厚度2mm左右,抹平并使抹面層厚度達到設(shè)計要求。
The plastering layer is divided into two layers. The thickness of the better layer of plastering glue is 2 ~ 3mm. It should be plastered with a stainless steel serrated spatula first, then leveled with a large spatula, and pressed into the glass fiber mesh while it is wet. When the glue is slightly dry and hard enough to touch, install the anchor, and block the plastic disc of the anchor and its surrounding with the plastering glue; The better layer of plaster mortar is slightly dry, and the construction of the second layer of plaster mortar can be carried out, with a thickness of about 2mm. Trowel and make the thickness of the plaster layer meet the design requirements.
此外巖棉保溫板施工時需保持表面干燥、無油脂、無銹蝕等條件,為了利于防腐,可采取適當(dāng)涂層,更多相關(guān)信息您可以來我們網(wǎng)站http://plisse.cn看看。
In addition, during the construction of rock wool insulation board, the surface should be kept dry, free of grease, rust and other conditions. In order to facilitate corrosion prevention, appropriate coating can be adopted. For more relevant information, you can come to our website http://plisse.cn have a look.